Dam Stubo-Rovni was made on the river Jablanica. It was finished after almost 25 years. Maximum depth of the dam is 67 m (220 ft). Filling of the accumulation caused a controversy when the public learned that it would submerge the Orthodox church of St. Michael in Tubravic. Despite the explanations by Serbian Patriarch Irinej and manager of the Public Utility "Kolubara" that the Church signed the contract and exchanged the property back in 1991, and that a replacement church had been built elsewhere, several public protests were held. However, the filling proceeded as planned, and the church got finally submerged on 15 March 2016.