0 Likes
Aerial photography by skycam.ee / Jaan Kronberg
The Pakri wind farm was completed in 2004. The first wind turbine was connected with the power grid on the 15th of December in 2004. Full capacity was achieved in March 2005.
The Pakri wind farm is located in Paldiski, at the tip of the Pakri Peninsula, partly in the old Soviet army coast guard territory. The wind farm comprises an area of 46 hectares.